Building Permits in ZIP 11208
Brooklyn, NY — 369 permits filed recently
369 permits
Proposed new temporary construction fence to resolve violation 35662336y
Installation of temporary construction fence in conjunction with job # b00995490
Remove walk-in freezer and install new walk-in freezer. Install condenser on 2nd floor roof.
Installation of pipe scaffolding as per plans in conjunction with job # b00995490. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this applica...
Installation of pipe scaffolding as per plans in conjunction with job # b00995490. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this applica...
Installation of temporary construction fence in conjunction with job # b00995490
Remove walk-in freezer and install new walk-in freezer. Install condenser on 2nd floor roof.
Existing four family house with mechanical work atcellar,1 st and 2nd floor. job filed to related to alt2application # b01358716-i1.2. no change in use, means of egress or occupancy
Existing four family house with plumbing work at cellar,1 st and 2nd floor. job filed to related to alt2 application# b01358716-i1.2. no change in use, means of egress or occupancy
Existing four-family house renovation with partition work at cellar, 1 st & 2nd floor under this application.2. no change in use, means of egress or occupancy
Existing four family house with plumbing work at cellar,1 st and 2nd floor. job filed to related to alt2 application# b01358716-i1.2. no change in use, means of egress or occupancy
Existing four family house with mechanical work atcellar,1 st and 2nd floor. job filed to related to alt2application # b01358716-i1.2. no change in use, means of egress or occupancy
Existing four-family house renovation with partition work at cellar, 1 st & 2nd floor under this application.2. no change in use, means of egress or occupancy
Chiller replacement. Air condensing unit replacement.
Proposed three (3) story new building
Proposed three (3) story new building
Chiller replacement. Air condensing unit replacement.
Installation of temporary construction fence as per plans. no change in use, occupancy, or egress under this application.
Alteration of existing 2-story 1-family house with horizontal addition to convert to 2-family house
Mechanical work filed in conjunction with the architecture application: replace existing exhaust fans with new, demo and removal of existing fuel oil, steam and consensate piping system throughot the...