Building Permits in ZIP 11206
Brooklyn, NY — 664 permits filed recently
664 permits
Minor interior renovation in existing laundry as per plans. no change of use, egress or occupancy.
P.s. 196-k proposed new ventilation system for an existing school building. all per plans submitted herewith.
Interior renovation to remove non load bearing wall and install new stage decking, change access to one bathroom and install a shower. no change in use egree or occupancy.
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
File to remove existing abandoned 2,000 gallon underground storage tank in yard as per plans. no change in use, egress or occupancy.
Minor interior renovation as per plans. no change of use, agress or occupancy
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
File to remove existing abandoned 2,000 gallon underground storage tank in yard as per plans. no change in use, egress or occupancy.
Minor interior renovation as per plans. no change of use, agress or occupancy
Exterior Facade Repair
Exterior Facade Repair
Installation of 6000 lb single personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy under this application...
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Installation of temporary construction fence at 760 broadway, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction fence at 760 broadway, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Installation of 6000 lb single personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy under this application...
Nycha boiler - removal and replacement of vacuum pump unit, condensate return unit with mechanical piping and duct-work for interior renovation of mechanical equipment room.
Interior renovation in cellar tank room
Support of Excavation for New 5-story Building