Building Permits in ZIP 11206
Brooklyn, NY — 664 permits filed recently
664 permits
6 story new building
Installation of a temporary wooden construction fence
6 story new building
6 story new building
Installaion of stucco on the front facade.
Installation of a temporary wooden construction fence
Plumbing work at exist. (4) apartments units on 2nd & 3rd floors; new apartment on first floor & cellar space, (5 bathrooms and 5 kitchens); boiler & meter rooms on cellar, scope of work transferred f...
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Application filed for facade leak repairs as per plans here within. no change in use, occupancy, or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.
K023, installation of chain link fence, sidewalk shed, and scaffold in conjunction with dob # 322053816. no change in use, egress, or occupancy.
Interior renovation as per plans filed herewith. no change to use, egress or occupancy.
Application filed for facade leak repairs as per plans here within. no change in use, occupancy, or egress.
Plumbing work at exist. (4) apartments units on 2nd & 3rd floors; new apartment on first floor & cellar space, (5 bathrooms and 5 kitchens); boiler & meter rooms on cellar, scope of work transferred f...
K023, installation of chain link fence, sidewalk shed, and scaffold in conjunction with dob # 322053816. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation as per plans filed herewith. no change to use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Nycha boiler - removal and replacement of plumbing fixtures and associated piping for interior renovation of mechanical equipment room.