Building Permits in ZIP 11205
Brooklyn, NY — 613 permits filed recently
613 permits
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
facade repair as per plans filed. no change in use egress or occupancy
existing 3 fam convert to 2 family -all related renovations as per plans submitted. Plumbing to be filed under separate application.
structural work in conjunction with OT#B00693050-I1. Plumbing, Mechanical filed under separate application.
Sprinkler application filed herewith in conjunction to nb application # b08013472-i1
Please assign to dev hub PROPOSED NEW EIGHT STORY 10 FAMILY MIXED USE BUILDING
Erect illuminated accessory business d/f blade sign for met fresh.
Civil work that includes but not limited to installation of an ADA-compliant accessible pathway near the ISC Building, Pratt University. No change of use, egress or occupancy.
structural work in conjunction with OT#B00693050-I1. Plumbing, Mechanical filed under separate application.
Erect illuminated accessory business d/f blade sign for met fresh.
Civil work that includes but not limited to installation of an ADA-compliant accessible pathway near the ISC Building, Pratt University. No change of use, egress or occupancy.
Rear facade repair in order to correct ECB violation #39169578N. No change in use egress, or occupancy.
Please assign to dev hub PROPOSED NEW EIGHT STORY 10 FAMILY MIXED USE BUILDING
existing 3 fam convert to 2 family -all related renovations as per plans submitted. Plumbing to be filed under separate application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
facade repair as per plans filed. no change in use egress or occupancy
Sprinkler application filed herewith in conjunction to nb application # b08013472-i1
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Proposing new 8 story and celler residential building.
New 2 family 4 story with cellar building