Building Permits in ZIP 11205
Brooklyn, NY — 613 permits filed recently
613 permits
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Nstallation of a temporary needle beam scaffold as per plans during nb construction. no change in use, egress or occupancy. needle beam scaffold to comply with 2022 nyc building code, chapter 33.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc building code, chapter 33.
Alt 01 proposed extension of existing 2-story to be a four (4)-story building with (10) ten dwelling units. pursuant to qualifying residence, horizontal and vertical extention, partial demolition. obt...
Fence application hereby filed for erection of temporary construction fence.
Alt 01 proposed extension of existing 2-story to be a four (4)-story building with (10) ten dwelling units. pursuant to qualifying residence, horizontal and vertical extention, partial demolition. obt...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Full demolition to a three story house
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Full demolition to a three story house
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
plumbing work at cellar to replace 1 gas hot water heater, 1 gas furnace and gas piping at cellar, and replace 1 res gas cook equipment at basement indicated on drawings filed herewith. No change in U...
General construction application for Apt 7A to reconfigure the primary bedroom entrance, relocate its closet, and add a hallway linen closet. Work includes demolition and erection of nonfire-rated par...