Nycha lafayette houses - building #2, installation of +/- 700 linear feet of temporary 8 feet high chain link fence submitting on behalf of contractor in conjunction with dob # b00994757. no change in...
Renovation of cellar boiler room - nycha boilers. work includes -install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
Plumbing specifications filed in conjunction with Alt-2 application #B01314925-I1.
Propose new 4-story plus cellar multi-family residential building as per plan. obtain new c of o.
herewith filed for an 8 ft plywood construction fence
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. ew concrete area ways at tank rooms.
Renovation of cellar mechanical room - nycha boilers replacement. work to include: install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Whitman #12, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Installation of suspended scaffold and material hoist for exterior facade repairs. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use, e...
Mh filled inconjunction with nb job
Installation of suspended scaffold and material hoist for exterior facade repairs. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use, e...
Remove existing hatches in both Building #280 machine room (FE#59/PE#60) and Building #5 Machine Room at Freight East. Providing 2 hour firerated wall and 90min. door at Building #5 Machine Room at Fr...
Installation of suspended scaffold and material hoist for exterior facade repairs. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use, e...
Installation of suspended scaffold and material hoist for exterior facade repairs. suspended scaffold and material hoist shall comply with chapter 33 of the 2022 nyc building code. no change in use, e...
Mh filled inconjunction with nb job
Remove existing hatches in both Building #280 machine room (FE#59/PE#60) and Building #5 Machine Room at Freight East. Providing 2 hour firerated wall and 90min. door at Building #5 Machine Room at Fr...
Whitman #12, Exterior Roofing & Railing repairs: Removal/replacement/repairs of existing roofing membrane, flashing, masonry units, bulkhead door, sealant, spalled concrete and drains. Install guard r...
Sprinkler specifications filed in conjunction with gc application b01108029-i1
INSTALLATION OF SCAFFOLD in conjunction with B08005181