Building Permits in ZIP 11204
Brooklyn, NY — 339 permits filed recently
339 permits
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Installation of interior non-load bearing partitions at cellar commercial space as per plans filed herewith. no change in use egress or occupancy under this application
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed 6 Story and cellar Community Facility Building
Filing plumbing drawings in conjunction with new building B00614751-I1.
Filing plumbing drawings in conjunction with new building B00614751-I1.
Proposed 6 Story and cellar Community Facility Building
Filing made to obtain work permit for existing canopy (awning as per dob inspector) at rear yard, in compliance with ecb violation # 39153958z. no change in egress, use or occupancy.
Filing made to obtain work permit for existing canopy (awning as per dob inspector) at rear yard, in compliance with ecb violation # 39153958z. no change in egress, use or occupancy.
Replace steps and brick veneer at front . replace windows and doors at bas and 001 level at front only.
Interior renovation and new windows to existing 2 story, 2 family residence. no change to use, egress
Proposed interior renovation of cellar, 1st & 2nd floor of existing 2 story building. new hvac, construction work as per plan, partition, flooring, ceiling and painting throughout. no change in egress...
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM iN CELLAR AND 1ST FLOOR; NEW BOILER AND HOT WATER HEATER IN CELLAR; NO CHAN...
Install new boiler and h.w.h. in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Proposed interior renovation of cellar, 1st & 2nd floor of existing 2 story building. new hvac, construction work as per plan, partition, flooring, ceiling and painting throughout. no change in egress...
Install new boiler and h.w.h. in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM iN CELLAR AND 1ST FLOOR; NEW BOILER AND HOT WATER HEATER IN CELLAR; NO CHAN...
Replace steps and brick veneer at front . replace windows and doors at bas and 001 level at front only.
Interior renovation and new windows to existing 2 story, 2 family residence. no change to use, egress
File plumbing work on 1st floor store with install new plumbing fixtures as per plan no change of use, egress, or certificate of occupancy.