Building Permits in ZIP 11201
Brooklyn, NY — 1,006 permits filed recently
1,006 permits
Demolition of existing urinal and cap its correlated sanitary, vent and cold-water piping on first floor. provide new bi level drinking fountain in westside playground with cold water inlet and sanita...
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Filing herewith interior renovation of existing basement dwelling unit in 2 family house as per plans. no change in use, egress, or occupancy.
Existing 6 story residential building. proposed interior renovation at apartment 3d. no change in occupancy, bulk, or egress.
SITE YARD WORK AS PER PLANS FILEDHEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Filing herewith interior renovation of existing basement dwelling unit in 2 family house as per plans. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Filing of hvac systems to obtain certificate of compliances as per plans. no change to use, occupancy or egress.
Demolition of existing urinal and cap its correlated sanitary, vent and cold-water piping on first floor. provide new bi level drinking fountain in westside playground with cold water inlet and sanita...
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
SITE YARD WORK AS PER PLANS FILEDHEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.