Building Permits in ZIP 11201
Brooklyn, NY — 1,006 permits filed recently
1,006 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy the sidewalk shed is at pierrepont street front of the building elevation.
Installation of a pre-fabricated steel support of excavation system to facilitate the construction of the new electrical transformer in the sidewalk
Installation of new interior partitions at the second floor including new elevator lobby. No change to use or occupancy.
Perform plumbing work. design includes the installation of service water heating for commercial kitchen of eating and drinking establishment. no change in use, egress, or occupancy under this filing.
Installation of temporary plywood panel enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Modification to mechanical as per plans. no change in use, egress or occupancy.
Interior renovation of 3rd fl. . no change in use occupancy, or egress.
Modification of HVAC system as per plans filed herewith.
structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Equipment use: single 6436# capacity personnel/material hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applicat...
Removal of some of the partitions and ceilings
Herewith file plans for interior renovation of apartment on 1st and 2nd floor. work will involve plumbing fixtures. no change in use, egress and occupancy.
Installation of new interior partitions at the second floor including new elevator lobby. No change to use or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Modification of HVAC system as per plans filed herewith.