Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Change of Use from a Two Family to a Single Family with new addition, general construction and demolition throughout per plans filed.
Legalization of installation of no-hub cast iron waste and vent piping for 5 water closets, 1 urinal, and 5 lavatory sinks.
Modification of sprinkler system for existing restaurant space
Alt-co filed to change occupancy of 3 story existing 3 family old law tenement into 2 family residence. portion of cellar to be established as habitable basement and counterd as zoning floor area. int...
General construction work is proposed in the existing unit #12A on the 7th floor. All per submitted plans. No changes to use, egress, or occupancy under this application
Existing steel reinforcement for exterior panel installation from the 3 rd floor level to the roof as indicated on plans submitted herewith.
Interior renovation of existing triplex apartment. New interior stair, reframing of stair opening.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
General construction work is proposed in the existing unit #12A on the 7th floor. All per submitted plans. No changes to use, egress, or occupancy under this application
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Existing steel reinforcement for exterior panel installation from the 3 rd floor level to the roof as indicated on plans submitted herewith.
Legalization of installation of no-hub cast iron waste and vent piping for 5 water closets, 1 urinal, and 5 lavatory sinks.
Hereby filing plans for the relocation of entrance door and minor concrete work at sidewalk to provide compliant ADA entrance with adequate slope (not a ramp). Remove and patch existing concrete slab....
Modification of sprinkler system for existing restaurant space
Modification to sprinkler systema as per plans.
Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.
Conversion of an exist. commercial floor to residential use on the 4th. floor.
Alt-co filed to change occupancy of 3 story existing 3 family old law tenement into 2 family residence. portion of cellar to be established as habitable basement and counterd as zoning floor area. int...