Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Job filed to show interior renovation to the basemenet and 4th floor and conversion from 10 dwelling units to 7 dwelling units as per plans filed herewith. new certificate of occupancy requested.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Propose interior renovation of existing eating and drinking establishment on partial 1st Floor as per plan. No change in use, egress, or occupancy.
Application filed to show the replaceiwent of lintel at front doors. no change in use, egress and occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Masonry restoration, terracotta replacement, waterproofing installation, lintel replacement,parapet rebuilding, roof membrane replacement as per plans filed herewith. no change to use, egress or occup...
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Emergency interior renovation of apartments 1b (1st floor), 2a and 2b (2nd floor), following damage from fire in adjacent units, perplans filed herewith.no change in use, egress or occupancy.
Installation of temporary plywood fence as per plans. no change in use, egress or occupancy.
Renovate kitchen and bathrooms in conjunction with Alteration B00867450-I1
modify existing ductworks, replace existing indoor VRF fan coil units to connect with existing rooftop VRF Heap Pump units.
Remove&replace exst damaged precast lintels at exposure #1. replace exst cracked precast lintels on exposure #4. replace any cracked/damaged bricks as needed and repoint where required. repair stucco...
Install underground plumbing piping to accommodate the new building.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of incoming services for domestic and fire water services to the the new building and sewer connections.
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Install fixtures and piping including medical gases to accommodate the new jail building as per plans filed herewith.