Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING Haagen - Dazs
Demolition of interior finishes, stair and interior partitions, windows/sliding door on 3rd floor. new partitions and finishes on 2nd and 3rd floor . no change to use, egress, or occupancy.
Installation of temporary construction fence. no change in use, egress, or occupancy under this application.
Facade repairs, scaffold inspections, 3 men letter
Electrification and Heat pump systems
Proposed minor alteration consisting of removal of non-load bearing walls, new & replaced light fixtures.
Replacement of ex. main roofing system, membrane flashing, main rof parapet + bulkhead for evironmental bldg (e) of nycct. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this...
Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.
Removal and installation of plumbing and gas fixtures as per plans.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
This Alteration application is being filed for the general construction & mechanical work for the interior renovation of apt 5S on 5th floor. There are no change in use, egress or occupancy.
Facade repairs, scaffold inspections, 3 men letter
Proposed minor alteration consisting of removal of non-load bearing walls, new & replaced light fixtures.
Replacement of ex. main roofing system, membrane flashing, main rof parapet + bulkhead for evironmental bldg (e) of nycct. no change in use, egress or occupancy.
This Alteration application is being filed for the general construction & mechanical work for the interior renovation of apt 5S on 5th floor. There are no change in use, egress or occupancy.
Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.
Electrification and Heat pump systems
Removal and installation of plumbing and gas fixtures as per plans.
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this...