Building Permits in ZIP 10473
Bronx, NY — 220 permits filed recently
220 permits
Remove and replace existing Vacuum pumps and condensate return units with new zone control valve.
File mechanical plan for renovation of existing 2 family dwelling 3-story building filed for mechanical plan
Exterior upgrades and roof replacement of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes to use, egress, or o...
The plumbing scope of work for this interior fit-out project include the installation, modification, and connection of the domestic water, gas, sanitary, and grease waste plumbing systems to support t...
The plumbing scope of work for this interior fit-out project include the installation, modification, and connection of the domestic water, gas, sanitary, and grease waste plumbing systems to support t...
Installation of new exhaust fan, make up air unit on the roof and duct work from the fans to the science classroom.
Installation of new exhaust fan, make up air unit on the roof and duct work from the fans to the science classroom.
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Install a new sump pump and replace a section of associated piping with new.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Install a new sump pump and replace a section of associated piping with new.
installation of solar panels, rooftop, railed, grid-tied, 21 modules, 8.61 kw
Building #10: shoring for column repairs as per plans.
Building #11: shoring for column repairs as per plans.