Building Permits in ZIP 10473
Bronx, NY — 216 permits filed recently
216 permits
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of solar pv system. no change to use, egress, or occupancy.
Filing Alt-St filing in conjunction with JOB # X01320271-I1 for Partial 2nd Floor Horizontal Enlargement, on an Existing 2 Story Building at a DEP-owned facility
Filing herewith installation of underground/onsite plumbing including installation of on site inlet conveyanance piping and underground retention systems.
Susbsequent application proposed to perform interior renovations of an existing one-family dwelling as per plans submitted herwith. no change in use, occupancy, or means of egress.
Susbsequent application proposed to perform interior renovations of an existing one-family dwelling as per plans submitted herwith. no change in use, occupancy, or means of egress.
Filing herewith installation of underground/onsite plumbing including installation of on site inlet conveyanance piping and underground retention systems.
provide new concrete pads for new Condensate return units and columns repairs as per plans.
provide new concrete pads for new Condensate return units and columns repairs as per plans.
Install new sprinkler heads as per plan.
Filing plans herewith for sitework including pavement grading and striping as indicated on plans.
Install new sprinkler heads as per plan.
Filing plans herewith for sitework including pavement grading and striping as indicated on plans.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
File plumbing work to legalize 1 lav, 1 toilet, 1 shower on 2nd floor as per plan to remove violation #35719288n. construction work under x01300616-i1 and mechanical work under x01300616-s2. no change...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
File plumbing work to legalize 1 lav, 1 toilet, 1 shower on 2nd floor as per plan to remove violation #35719288n. construction work under x01300616-i1 and mechanical work under x01300616-s2. no change...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Soundview Bldg 10, Remove & Replace existing slab-on-grade, interior non load bearing CMU partition walls and spalled/cracked CMU block. Coat concrete walls, floors and ceilings. Patch/repair conc. co...