Building Permits in ZIP 10465
Bronx, NY — 206 permits filed recently
206 permits
NYC dob now build alteration application filed to renovate existing first floor office partitions and install new handicapped accessory toilet room separate does now application be filed for plumbing...
New temporary 8'-0 wood construction fence
Installation of photovoltaic solar array on roof incluing all related structural work as per plans filed herewith. no changeto use, egress or occupancy.
New temporary 8'-0 wood construction fence
NYC dob now build alteration application filed to renovate existing first floor office partitions and install new handicapped accessory toilet room separate does now application be filed for plumbing...
Pile support foundation with grade beam spanning to pile caps. A spanning slab is supported on piers supported by the grade beams and pile caps
New 1 story building framed with steel.
Job to be assigned to development hub as per our HUB consultation. Filing herewith for a 1 story building framed with steel (Facility Building).
New 1 story building framed with steel.
Job to be assigned to development hub as per our HUB consultation. Filing herewith for a 1 story building framed with steel (Facility Building).
Pile support foundation with grade beam spanning to pile caps. A spanning slab is supported on piers supported by the grade beams and pile caps
Installation of Navien combination boiler NCB-150 in cellar and new fixtures 1st and 2nd floor
Proposed 8' temporary construction fence align with the property line.
Proposed 8' temporary construction fence align with the property line.
Installation of Navien combination boiler NCB-150 in cellar and new fixtures 1st and 2nd floor
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Replacement of existing gas line and installation of gas furnace for existing one-family dwelling.
Nycha throggs neck addition, bld. #31 - installation of +/-20 feet high x +/- 155 feet long temporary supported scaffolding on the roof level, as per plans, for bulkhead roof replacement work. no chan...
Nycha throggs neck addition, bld. #33 - installation of +/-20 feet high x +/- 155 feet long temporary supported scaffolding on the roof level, as per plans, for bulkhead roof replacement work. no chan...