Building Permits in ZIP 10455
Bronx, NY — 340 permits filed recently
340 permits
Installation of temporary construction fence at 370 east 153 street, bronx, ny 10455 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of medium duty pipe scaffold.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
full demolition of two story structure, using hand held tools only. Machine will be used to cart off debris only.
Hoist Installation only.
Hoist Installation only.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
full demolition of two story structure, using hand held tools only. Machine will be used to cart off debris only.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Cap and remove illegal plumbing fixtures in cellar as per plans. no change in use, egress or occupancy is involved under this application.
Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application...
Cap and remove illegal plumbing fixtures in cellar to restore to legal condition as per plans. no change in use, egress or occupancy is involved under this application.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Cap and remove illegal plumbing fixtures in cellar as per plans. no change in use, egress or occupancy is involved under this application.
Cap and remove illegal plumbing fixtures in cellar to restore to legal condition as per plans. no change in use, egress or occupancy is involved under this application.
Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application...
Sidewalk Shed Installation
Remove and reinstall of air-cooled condensing unis on roof and first floor, evacuate and extend refrigerant piping, power, control wiring and etc.
Remove and reinstall of air-cooled condensing unis on roof and first floor, evacuate and extend refrigerant piping, power, control wiring and etc.
Sidewalk Shed Installation