INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Filing for the installation of construction fence on behalf of contractor
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Filing for the installation of construction fence on behalf of contractor
Mitchel Bldg 04, Exterior facade & roof repairs: Removal/replacement/repairs to roofing system, cracked masonry, spalled concrete, spandrel beams, windows sill & sealant, and roof drains. Masonry pinn...
SITYARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Support of excavation
Removal of existing roof membrane & insulation, prep & installation of new roofing membrane, insulation, flashings & accessories. temp removal & reinstall of rooftop fans & condensing units/drains to...
Removal of existing roof membrane & insulation, prep & installation of new roofing membrane, insulation, flashings & accessories. temp removal & reinstall of rooftop fans & condensing units/drains to...
Support of excavation
Gas re-pipe to existing furnace.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Adding a lift at the exterior of the building from floor 1-3, No change in occupancy, egress or use.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.