Building Permits in ZIP 10452
Bronx, NY — 467 permits filed recently
467 permits
Provide new masonry and structural cold-formed steel superstructure in conjunction with nb application #240293366.
Filing for temporary construction fence. No change in use, egress or occupancy.
Provide new masonry and structural cold-formed steel superstructure in conjunction with nb application #240293366.
Heavy duty sidewalk shed during exterior facade repairs filed under application # x01208224. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl...
Heavy duty sidewalk shed during exterior facade repairs filed under application # x01208186. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl...
Sprinkler work in conjunction to the ALT-CO Application #X01192568-I1
Provide mechanical system for new building. system includes heating and cooling system and building ventilation system. no change in egress, occupancy, and zoning under this filing.
Heavy duty sidewalk shed during exterior facade repairs filed under application # x01208186. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl...
Sprinkler work in conjunction to the ALT-CO Application #X01192568-I1
Provide mechanical system for new building. system includes heating and cooling system and building ventilation system. no change in egress, occupancy, and zoning under this filing.
Filing for Facade Repairs work that includes brick masonry and waterproofing repairs, steel lintel replacement, parapet wall repairs, repair of mortar joints, etc. as shown on plans filed herewith. No...
Relocation of one floor drain and associated piping
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Relocation of one floor drain and associated piping
Filing for Facade Repairs work that includes brick masonry and waterproofing repairs, steel lintel replacement, parapet wall repairs, repair of mortar joints, etc. as shown on plans filed herewith. No...
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Furnish & install cast-in-place concrete equipment pad at grade for proposed condenser unit.
New 17-story mixed-use building
Superstructure in conjunction with construction of 17-story new building
Landscaping and site grading in conjunction with construction of new building.