Building Permits in ZIP 10451
Bronx, NY — 237 permits filed recently
237 permits
Construction fence filed in conjunction with nb #210181462
Mechanical application filed in-conjunction with NB application.
Structural application filed in-conjunction with NB application 210181444
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Replace (2) existing hospital generators - One generator requires its radiator components to be replaced and One generator requires that the 250 gallon day tank be replaced. Day tank replacement filed...
Removal of existing metal stair in adjacent lot. rerouting of egress on existing stair inside building. no change of use, or occupancy.
Pl work in conjunction with the nb application filed for 19 story r2 supportive housing. project name - west tower. fee deferral letter is under supporting documents.
Removal of existing metal stair in adjacent lot. rerouting of egress on existing stair inside building. no change of use, or occupancy.
Pl work in conjunction with the nb application filed for 19 story r2 supportive housing. project name - west tower. fee deferral letter is under supporting documents.
Remove 2 HVAC units from the roof.
Alteration type 3 - install supported pipe scaffolding as per drawings. no change in use, occupancy or means of egress.
Alteration type 3 - install supported pipe scaffolding as per drawings. no change in use, occupancy or means of egress.
Remove 2 HVAC units from the roof.
Application filed to construct new 9 story mixed use building