Installation of Cold-Formed Steel and Light Gage Framing to Support and Frame New Retail Store Mall Concourse Storefront on Part of 2nd Floor
Installation of new 9'-0 curb cut to be combined with adjacent, totaling 18'-0
Installation of Cold-Formed Steel and Light Gage Framing to Support and Frame New Retail Store Mall Concourse Storefront on Part of 2nd Floor
Direct replacement of (2) rooftop hvac single package units on existing roof curbs
Direct replacement of (2) rooftop hvac single package units on existing roof curbs
Removal of Existing Plumbing Fixtures and Associated Piping and Installation of Plumbing Fixtures, Floor Drain, Non-Gas Water Heater and Associated Piping Within Retail Store Space on Part of 2nd Floo...
Removal of Existing Plumbing Fixtures and Associated Piping and Installation of Plumbing Fixtures, Floor Drain, Non-Gas Water Heater and Associated Piping Within Retail Store Space on Part of 2nd Floo...
Herewith filing for sprinkler modifications (phase 2) at existing Media and TV Studios at 1st as per plans. No change in Use, Egress or Occupancy is proposed under this application.
Application is filed for the construction of a 8'-0 high temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed under this application.
Herewith filing for sprinkler modifications (phase 1) at existing Media and TV Studios at 1st and 2nd floor as per plans. No change in Use, Egress or Occupancy is proposed under this application.
Modification of sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application for retail store d1, space 2058.
Installation of new 9'-0 curb cut to be combined with adjacent, totaling 18'-0
Herewith filing demolition and renovations at existing Media and TV Studios at 1st Floor and Build-out of new computer lab as 2nd floor as per plans. No change in Use, Egress or Occupancy is proposed...
Herewith filing for sprinkler modifications (phase 2) at existing Media and TV Studios at 1st as per plans. No change in Use, Egress or Occupancy is proposed under this application.
Herewith filing for sprinkler modifications (phase 1) at existing Media and TV Studios at 1st and 2nd floor as per plans. No change in Use, Egress or Occupancy is proposed under this application.
Installation of new 9'-0 curb cut to be combined with adjacent, totaling 18'-0
Application is filed for the construction of a 8'-0 high temporary construction fence. all work as per plans submitted herewith. no change in use, egress or occupancy filed under this application.
Herewith filing demolition and renovations at existing Media and TV Studios at 1st Floor and Build-out of new computer lab as 2nd floor as per plans. No change in Use, Egress or Occupancy is proposed...
Modification of sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application for retail store d1, space 2058.
Installation of solar panels, rooftop, railed, grid-tied, 24 modules, 9.84kw