Building Permits in ZIP 10310
Staten Island, NY — 177 permits filed recently
177 permits
Plumbing work filed in conjunction with gc application. work to include: installation of new gas piping for dryers and doas unit. no change in use, egress or occupancy.
Plumbing work filed in conjunction with gc application. work to include: installation of new gas piping for dryers and doas unit. no change in use, egress or occupancy.
Application to remove existing sunroom to build a 1 story horizontal enlargement to the existing 1 family residence - modification of non bearing partitions with new finishes as per the plans filed he...
Installation of photovoltaic solar array on existing roof system as per plans.
Interior renovation of existing building. replacement of windows & doors & existing convector housing, new finishes & light fixtures, renovation of lobby, new fixtures & finishes. minor masonry repair...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Application to remove existing sunroom to build a 1 story horizontal enlargement to the existing 1 family residence - modification of non bearing partitions with new finishes as per the plans filed he...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Interior renovation of existing building. replacement of windows & doors & existing convector housing, new finishes & light fixtures, renovation of lobby, new fixtures & finishes. minor masonry repair...
Installation of new storm piping, water/sanitary plumbing work subsequent filing to general construction (gc) filing.
Storm drainage
Soe/ps19r - for support of excavation submitting on behalf of contractor, related to job s01075004, s01289569 no change in use, occupancy or egress
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Soe/ps19r - for support of excavation submitting on behalf of contractor, related to job s01075004, s01289569 no change in use, occupancy or egress
Installation of new storm piping, water/sanitary plumbing work subsequent filing to general construction (gc) filing.
Storm drainage
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change to use, egress or occupancy.
Interior renovation of existing building. replacement of windows & doors & existing convector housing, new finishes & light fixtures, renovation of lobby, new fixtures & finishes. minor masonry repair...
Filed herewith; residential sprinkler plan
Remove and replace pavement, staircases, wood siding & guard rails. install new deck and enlarge windows in rear yard of 2 family dwelling. Work done to address violation #041822C22-01117. THERE IS NO...