Building Permits in ZIP 10306
Staten Island, NY — 350 permits filed recently
350 permits
HUB Consultation was accepted on 6/24/2021 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 529 Greeley Avenue. Subsequent filing to NB Job Numb...
Proposed 8'-0 high temp. construction fence
HUB Consultation was accepted on 6/24/2021 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 529 Greeley Avenue. Subsequent filing to NB Job Numb...
Proposed 8'-0 high temp. construction fence
Installation of new plumbing fixtures for a detached two-family dwelling.
Installation of new plumbing fixtures for a detached two-family dwelling.
Installation of new plumbing fixtures for a detached two-family dwelling.
Installation of new plumbing fixtures for a detached two-family dwelling.
Application filed to obtain a work permit to correct ECB violation #35588175 and DOB violation #0201DT. Related approved legalization application DOB NOW JOB #S00653489-I1 (approved on: 04/26/23)
Application filed to obtain a work permit to correct ECB violation #35588175 and DOB violation #0201DT. Related approved legalization application DOB NOW JOB #S00653489-I1 (approved on: 04/26/23)
Plumbing work filed in conjunction with the general construction application, no change in use, egress, or occupancy under this application
Plumbing work filed in conjunction with the general construction application, no change in use, egress, or occupancy under this application
Application filed to obtain a work permit to correct ECB violation #35588175 and DOB violation #0201DT. Related approved legalization application DOB NOW JOB #S00653489-I1 (approved on: 04/26/23)
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 770 Patterson Avenue. Subsequent filing to New Buildin...
Paa (p1) filed to revise plumbing plans and application.
Installation of photovoltaic solar array on existing roof system as per plans
Installation of photovoltaic solar array on existing roof system as per plans
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 770 Patterson Avenue. Subsequent filing to New Buildin...
Paa (p1) filed to revise plumbing plans and application.
Herewith filing for the relocation and reduction of an existing curb cut. construction work performed under a separate application.