Renovation Permits in Philadelphia, Pennsylvania
1,473 renovation permits filed recently
1,473 permits
Addition and/or Alteration - For the erection of an addition, to include two roof decks and a pilot house, and for interior and exterior alterations to an existing attached single-family dwelling per...
Addition and/or Alterations - FOR THE INSTALLATION OF FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 -INCH WILKINS 950XLT2BFSS BACKF...
Addition and/or Alterations - FOR THE INSTALLATION OF AN NFPA 13R SYSTEM FOR A MULTI-FAMILY DWELLING SERVICED BY A FOUR (4) INCH FIRE SERVICE LINE WITH A 4-INCH WILKINS 350AST BACKFLOW PREVENTER AND A...
Addition and/or Alteration - - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of con...
Addition and/or Alterations - EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construct...
Addition and/or Alterations - FOR THE INSTALLATION OF A NEW FIRE SERVICE LINE AND NEW BACKFLOW PREVENTOR TO AN EXISTING FIRE SPRINKLER SYSTEM AS PER PLANS. NO CHANGE TO EXISTING INTERIOR PIPE, SPRINKL...
Addition and/or Alteration - propose interior renovation. detail in the plan. no structural work.
Addition and/or Alteration - LEVEL III ALTERATIONS (NO CHANGE OF OCCUPANCY) TO INCLUDE PARTIAL DEMOLITION AND GROUND FLOOR ADDITIONS TO AN EXISTING HIGH-RISE MULTI-FAMILY DWELLING AS PER APPROVED PLAN...
Addition and/or Alteration - - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of con...
Addition and/or Alteration - FOR LEVEL III ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY (NO CHANGE OF OCCUPANCY CLASSIFICATION, GROUP R-3 TO GROUP R-3) TO CREATE A TWO-FAMILY DWELLING WITHIN AN EXISTI...
Addition and/or Alteration - FOR LEVEL I ALTERATIONS (REMOVAL AND REPLACEMENT OF TOPPING SLABS AND DRAINS) AT SPECIFIED LOCATIONS THROUGHOUT THE EXISTING GROUP A-5 OUTDOOR BASEBALL STADIUM (CITIZENS B...
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEM...
Addition and/or Alteration - Interior renovations to create two family dwelling in an existing structure, details as shown on the plans.
Addition and/or Alteration - interior renovation of 2nd floor only of an existing 2 family dwelling, details as shown on the plan. minimum 1 hour fire separation shall be maintained between dwelling u...
Addition and/or Alteration - FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
Addition and/or Alteration - - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of con...
Addition and/or Alterations - FOR THE INSTALLATION OF 2O SPRINKLER HEADS TIED INTO EXISTING AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13. ALL WORK SHALL BE DONE IN ACCORDANCE...
Addition and/or Alteration - FOR ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE USED AS A TWO-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN. BASEMENT TO REMAIN UN-FINISHED/UTILTY ONLY.
Addition and/or Alteration - FOR INTERIOR ALTERATIONS TO AN EXISTING ATTACHED SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
Addition and/or Alteration - Front porch roof repair, details per plan.