New Construction Permits in Philadelphia, Pennsylvania
800 new construction permits filed recently
800 permits
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION...
New Construction - FOR INSTALLATION OF A ONE-INCH COMBINED FIRE/DOMESTIC WATER SERVICE LINE AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13D.
New Construction - INSTALL NEW FIRE SUPPRESSION SYSTEM AND 1” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL...
New Construction - INSTALLATION OF A ONE&HALF (1 ½”) INCH COMBINED SERVICE LINE FOR A FIRE & DOMESTIC SUPPLY LINE AND FIRE SERVICE LINE WITH REMOTE TOILET CONNECTION PER PLANS. FOR A MULTIPURPOSE RESI...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A ONE-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FI...
New Construction - FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS....
New Construction - FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT A THREE (3) STORY SINGLE-FAMILY DWELLING TO INCLUDE A ONE-AND-A-HALF (1-1/2) INCH COMBINED DOMESTIC AND FIRE SER...
New construction, addition, GFA change - FOR THE ERECTION OF A ROOF DECK ON AN EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS.
New construction, addition, GFA change - FOR THE ERECTION OF A REAR THIRD FLOOR ADDITION TO AN EXISTING ATTACHED BUILDING. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.
New construction, addition, GFA change - FOR THE ERECTION OF A REAR ADDITION ON AN EXISTING ATTACHED STRUCTURE TO INCLUDE THE ERECTION OF AN ACCESSORY STRUCTURE IN THE REAR. SIZE AND LOCAITON AS SHOWN...
New construction, addition, GFA change - FOIR THE ERECTION OF A REAR DECK ON AN EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS.
New construction, addition, GFA change - For the erection of an attach structure for use as commercial space on basement and ground floor and three (3) units multi-family above with roof deck access b...
New construction, addition, GFA change - FOR THE ERECTION OF A REAR ADDITION TO AN EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS
New Construction - FOR THE ERECTION OF A REAR AND VERTICAL ADDITION ON AN EXISTING ATTACHED STRUCTURE AND LEVEL III ALTERATION WITH COMPLETE CHANGE OF OCCUPANCY CLASSIFICATION TO CREATE FOUR (4) DWELL...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT THE ENTIRE BUILDING WITH 2” FIRE SERVICE AND 2" BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL...
New Construction - FOR ERECTION OF A 4-STORY TWO-FAMILY NEW CONSTRUCTION AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
New Construction - FOR NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH ROOF DECK ACCESSED VIA WALL OPENING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, EL...
New Construction - FOR NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH ROOF DECK ACCESSED VIA WALL OPENING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, EL...
New Construction - FOR NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH ROOF DECK ACCESSED VIA WALL OPENING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, EL...
New Construction - FOR NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH ROOF DECK ACCESSED VIA WALL OPENING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, EL...