New Construction Permits in Philadelphia, Pennsylvania
812 new construction permits filed recently
812 permits
New Construction - FOR THE INSTALLATION OF SPRINKLER SYSTEM PER NFPA 13R WITH 2-INCH FIRE SERVICE LINE AND BFP DEVICE AS PER APPROVED PLANS.
New Construction - FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH ROOF DECK (ACCESSED VIA THIRD-FLOOR WALL OPENING). BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR ME...
New construction, addition, GFA change - FOR THE ERECTION OF TWO (2) HORIZONTAL ADDITIONS TO THE SIDE AND REAR OF AN EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN.
New Construction - FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 X...
New Construction - FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER AP...
New construction, addition, GFA change - FOR THE ERECTION OF A THIRD FLOOR ADDITION ABOVE AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING; SIZE AND LOCATION AS PER BUILDING APPLICATION...
New construction, addition, GFA change - For the erection of a semi-detached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of an attached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - For the erection of a semi-detached structure, to include a full basement. Size and location per plan.
New construction, addition, GFA change - FOR THE 3RD FLOOR REAR ADDITION TO THE REAR PORTION OF THE EXISTING ATTACHED STRUCTURE WITH NEW REAR DECKS ON THE 2ND AND 3RD FLOOR LEVELS, SIZE AND LOCATION A...
New construction, addition, GFA change - For the erection of an attach structure to be use as five units multi-family household living. SIZE and LOCATION per plan.
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION...