Plumbing Permits in Staten Island, New York
540 plumbing permits filed recently
540 permits
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Legalize existing LAARS Gas Fired Water Heater (MODEL#PWO715IN09K). Legalization scope of work is limited to the exist LAARS water heater's domestic and gas piping only. No change to use, egress or oc...
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
exterior storm piping
Application filed herewith for a horizontal and vertical addition, installing new plumbing throughout cellar, first floor and second floor.
Hereby filing for the installation of plumbing and sprinkler heads. no change to use occupancy or egress.
Installation of sanitary,drainage and domestic water. No change of use, egress or occupancy under this application.
Exterior storm piping
Selective removals/disconnections: 5-WC, 2-Urinals, 2-Lavatories and Associated Valves; Installation of: 4-WC, 2-Chair Carries, 5-Flushometers, 1-Urinal, 2-Lavatories, 2-Wall Carriers, 2-Battery Fauce...
Plumbing work in conjunction with interior renovation work on the first floor. no change to use, egress or occupancy. store # 1432/kiosk #5514 (haagen dazs)
Application filed to remove all interior work, furniture, appliances and finishes in existing commercial space. plumbing application to be filed separately.
Exterior Storm piping
Filing for plumbing and medical gas.
Installation of new plumbing fixtures and service in conjuntion with new building application
Plumbing work in conjunction with interior renovation work on the first floor. no change to use, egress or occupancy. store # 1432/kiosk #5514 (haagen dazs)
Application filed to remove all interior work, furniture, appliances and finishes in existing commercial space. plumbing application to be filed separately.
Selective removals/disconnections: 5-WC, 2-Urinals, 2-Lavatories and Associated Valves; Installation of: 4-WC, 2-Chair Carries, 5-Flushometers, 1-Urinal, 2-Lavatories, 2-Wall Carriers, 2-Battery Fauce...
Hereby filing for the installation of plumbing and sprinkler heads. no change to use occupancy or egress.
Installation of new plumbing fixtures and service in conjuntion with new building application