Plumbing Permits in Staten Island, New York
544 plumbing permits filed recently
544 permits
Installation of new water service and fire sprinklers
Plumbing application filed in conjunction wtih nb for new building. applicable to house and garage.
Modification to existing sprinkler, plumbing and standpipe fixtures as per plans filed herewith. No change to existing use, egress or occupancy.
Plumbing application filed in conjunction wtih nb for new building. applicable to house and garage.
Modification to existing sprinkler, plumbing and standpipe fixtures as per plans filed herewith. No change to existing use, egress or occupancy.
Plumbing for residential building
App is filed to document all gas fixtures in building; to remove and replace all gas piping in building while maintaining exist. fixtures/ appliances and; to legalize exist. toilet, lav & sink at the...
PLUMBING FOR RESIDENTIAL BUILDING showing no dryer in basement
Plumbing for residential building
App is filed to document all gas fixtures in building; to remove and replace all gas piping in building while maintaining exist. fixtures/ appliances and; to legalize exist. toilet, lav & sink at the...
PLUMBING FOR RESIDENTIAL BUILDING showing no dryer in basement
Removal of fixtures and bath tubs. First phase preparatory interior demolition. No work to VCT or Mastic.
Subsequently file plumbing work with installing appliances for the commercial space. no change in use, egress or occupancy.
Remove fixtures and bath tubs. First phase preparatory interior demolition. No work to VCT or Mastic.
Plumbing application filed in conjunction with nb application for new residence. also included sprinkler heads under plumbing worktype.
Plumbing application filed in conjunction with nb application for new residence. also included sprinkler heads under plumbing worktype.
Subsequently file plumbing work with installing appliances for the commercial space. no change in use, egress or occupancy.
Remove fixtures and bath tubs. First phase preparatory interior demolition. No work to VCT or Mastic.
Removal of fixtures and bath tubs. First phase preparatory interior demolition. No work to VCT or Mastic.
Plumbing application filed in conjunction with nb applicaton for new building, including sprinkler heads filed under plumbing work type.