Renovation Permits in Minneapolis, Minnesota
484 renovation permits filed recently
484 permits
remodel 2nd floor bathroom and closet Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Windows installed under this permit shall meet the requirements of the current Minnes...
(DMH - Pdox) INSTALLATION OF BASEMENT EGRESS WINDOW & WELL AT SIDE YARD OF SFD. THIS PERMIT IS NOT APPROVAL OF ANY SLEEPING ROOMS, IMPROVEMENTS MADE WITHOUT A PERMIT, OR WORK OTHER THAN DESCRIBED. A S...
CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOW...
CONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOW...
(DMH-Pdox) KITCHEN & 2ND FLOOR BATH REMODEL IN SFD. NEW TUB/SHOWER COMBO IN NEW LOCATION. - 2020 MNSBC NO WINDOWS. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR G...
remove and replace front entrance steps. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM...
remove and replace front entrance steps MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM T...
(DMH - Pdox) INSTALLATION OF 4 BASEMENT EGRESS WINDOWS & WELLS AT SIDES & REAR YARD OF SFD. -2020 MNSBC THIS PERMIT IS NOT APPROVAL OF ANY SLEEPING ROOMS, IMPROVEMENTS MADE WITHOUT A PERMIT, OR WORK O...
remove and replace front entrance steps MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM T...
replace front entry stoop ans teps. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OR MORE RISERS) 7 3/4" MAXIMUM RISE ALLOWED AND 10" MINIMUM TREAD...
Bathroom remodel work in existing single family house. aaj (project dox plan) - replace existing bathtub with new shower stall and surrounds as required by code ***note: per applicant, no work to be d...
Repair water damage no alterations allowed by this permit 2020 msbc
(DMH-Pdox) INTERIOR DEMO & REMODEL TO APPROX 500 SQFT SFD INCLUDING KITCHEN & BATHROOM. REPLACE 2 WINDOWS. FRAME & FINISH BASEMENT LEVEL INCLUDING NEW HALF BATH. INSTALL NEW EXTEROR DOOR LOCATION. INS...
(DMH-Pdox) REMODEL 2ND FLOOR BATHROOM IN SFD. REPLACE FIXTURES IN SAME LOCATIONS. - 2020 MNSBC NO WINDOW REPLACMENT. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR...
Units 20-24. finish work. (jjl)
Retail tenant improvement -ACW certificate of occupancy required: no special inspections required: no const type: II-B occupancy: M 2020 MSBC occupant load: 49 sprinklered: no 20% accessibility upgrad...
remodel 2nd floor bathroom Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Windows installed under this permit shall meet the requirements of the current Minnesota State R...
construct 3 level pedestrian walkway connection between adjacent buildings. certificate of occupancy required: no special inspections required: yes const type: noncombustible, not fire protected 2020...
Doing siding repair on two gables.
Non-structural remodel of bathroom and kitchen in main floor unit of two-family dwelling (up/down duplex with unfinished basement). fire and sound floor/ceiling assembly between upper and lower dwelli...