Renovation Permits in Los Angeles, California
7,586 renovation permits filed recently
7,586 permits
Soft story retrofit as per labc ch 93. (n) omf and (n) sccs.
eplan** Supplemental Permit to 23016-20001-02649 to Remove Existing Wall between Kitchen and Living. Non-Bearing Wall
Eplan. Tenant improvement to (E) bank
SUPPLEMENTAL PERMIT FOR: 1.Slide attraction/apparatus added back in as part of a Modification route with LAFD; 2. Recessed Pit/Slab configuration and associated details have been changed & updated. 3....
addition of 2'-7" x 5'-8" washer and dryer enclosure to (E) SFD. Work per WFPP
addition to existing SFD and attached ADU
ePlanREMODEL (E) SFD AND CONVERT INTO SB9 DUPLEX, WITH GROUND FLOOR ADDITIONS. DUPLEX PER SB9 TWO UNIT DEVELOPMENT.
13 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and win...
Enclose existing attached patio covers in the front (9'-2"X4'-10") and rear (14'X15') of (E) SFD and covert to livable area. Front porch and rear addition to (E) S.F.D. Remodel to (E) S.F.D. Design pe...
NEW 2ND FLOOR ADDITION AND CONVERSION (E) GARAGE TO 2-STORY ADU PER LAMC 12.22 A.33(b)(1). - BLDG SPRINKLERD THRU-OUT.
Kitchen remodel for residential buildings (no structural changes).
Supplemental permit to 25014-20000-01836 (addition to SFD) to remove proposed landscape wall from plans
Eplan convert (e) alq to sfd per sb9.
EPLAN: Conversion of attached garage to ADU per GCS 66323 (a)(1). All work per WFPP.
EPLANSupplemental permit to 25016-10000-20673 change scope of work to: "Remodel SFD and convert portion to attached ADU per state law."NO CHANGE IN DESIGN NOR BUILDING DIMENSION
eplanla: Structural Interior Remodel in Kitchen, remove interior partition & provide new beam.
Bathroom (2) remodel for residential buildings (no structural changes).
Replacement of damaged framing members (less than 10% of replacement cost of building) for single family dwellings and duplex (not including decks).
Proposed addition and major remodel to (e) 1-story sfd. nfpa 13d fire sprinklers throughout. all work per engineering.
Eplan: 2nd floor addition above garage attached to sfd to create a 2nd floor recreation room per engineering