Other Permits in Los Angeles, California
1,985 other permits filed recently
1,985 permits
[n] 2-story single-family dwelling with attached two car garage nfpa 13d sprinklered through out
retaining wall & fence wall at property line *** 2 of 3 ***
Excavation and backfill for new retaining wall under 25020-20000-02307.
2025 wildfire rebuild, single-family dwelling with an attached garage, (2)-story. nfpa 13d sprinklers throughout eo1
Site grading for new 2 story single family dwelling with attached garage and retaining wall cut 385 cy fill 11 cyimport 0 cy export 374 cy removal and recompaction 344 cy
Proposed new retaining wall per engineer. ht = 4', l = 60'
***2025 Ineligible Wildfire Project*** New retaining wall
New retaining wall
2025 WILDFIRE REBUILD, SINGLE-FAMILY DWELLING WITH AN ATTACHED GARAGE AND ACCESSORY DWELLING UNIT PER GC 66323(a)(1), 2-STORY. NFPA 13D SPRINKLERS THROUGHOUT INELIGIBLE
Eplan NEW 2 STORY TWO UNIT ACCESSORY DWELLING UNIT PER STATE LAW FOR MULTI FAMILY ACCESSORY DWELLING UNIT PER CA Govt. Code 65852.2(e)(1)(D) and applicable part2 of LAMC 12.22 A.33 (c)-(d), (g)COMPLY...
NEW CAST IN PLACE REINFORCED CONCRETE ARCH PEDESTRIAN BRIDGE WITH POST TENSIONED CONCRETE DECK. Construction shall not commence without a CALOSHA permit
Supplemental to 25030-20000-07149 to revise geotechnical engineer of record
Site grading for new two story single family dwelling with attached garageand retaining wallcut 803 cyfill 0 cyimport 0 cyexport 803 cy removal and recompaction 361 cy
2025 wildfire rebuild, single-family dwelling with an attached garage, 2-story. nfpa 13d sprinklers throughout. eo8
New retaining wall
2025 wildfire rebuild, single-family dwelling with an attached garage, (2)-story. nfpa 13d sprinklers throughout eo1
***2025 Ineligible Wildfire Project*** new site retaining wall--- 2 of 3 ---
ePlan: NEW RETAINING WALL WITH 6' MAX HEIGHT
**2025 Wildfire Project**Not Eligible*** Construction of a new retaining wall located at the rear of the property to support grade changes and site stability per geotechnical (soils) report
grading for new sfd