Other Permits in Los Angeles, California
1,984 other permits filed recently
1,984 permits
2025 wildfire rebuild, single-family dwelling with an attached garage and basement, 2-story, 44' x 66'-10". nfpa 13d sprinklers throughout. eo1
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 13. State certified modular structure.
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 5. State certified modular structure.
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 15. State certified modular structure.
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 7. State certified modular structure.
NEW ONE STORY DETACHED ACCESSORY DWELLING UNIT AS PER LAMC 12.22 A.33(b)(1), NFPA-13R FIRE SPRINKLERS THROUGHOUT, ALL WORK PER ENGINEERING- SEE COMMENTS
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 8. State certified modular structure.
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 14. State certified modular structure.
(ePLAN) New detached 1200 SF accessory dwelling unit per LAMC 12.22 A.33 (c)-(d). All work per engineer. Type VA construction with NFPA-13R sprinklers.
***2025 wildfire rebuild eo1 eligible project*** new 7'-11" high max x 24' in length retaining wall.
****2025 wildfire eo-1 eligible rebuild****remove and reccompact under the building and site grading- see comments
Emergency Homeless Shelter per Section 12.80 and Government Code Section et seq. BUILDING 3. State certified modular structures
***2025 wildfire e01 eligible rebuild project*** shoring
***2025 wildfire e01 eligible rebuild project***grading for new sfd with basement and attached garage
2025 wildfire rebuild, single-family dwelling, 1-story. nfpa 13d sprinklers throughout. eo8
(n) 2-story w/mezzanine office building at rear of lot with parking below on the 1st floor parking. fully sprinklered
ePlan:New 30' 3" x 30' two story, second story ADU per LAMC 12.22 A.33(c)* and (d)*, with attached 2 car garage on the first story. All work done per engineer
Two retaining walls
EPLAN: Grading- excavate and backfill for retaining wall on piles
ePlan NEW 3-story SFD with attached ADU per LAMC 12.22A.33(c) and (e). TWO attached 2- car garages on 1st floor. To be fully sprinklered NFPA 13D.