HVAC Permits in Los Angeles, California
175 hvac permits filed recently
175 permits
eplan Supplemental to 25014-10000-02454 REVISIONS TO HVAC TYPE FROM CENTRAL TO MINI SPLIT AND TITLE 24. STRUCTURAL CHANGES TO THE FOUNDATION
New 1st floor addition to (e) 2-story for new family room, laundry and bathroom , new 2nd floor addition to (e) sfd for new master bedroom , master bathroom , master w.i.c., mechanical closet, nfpa-13...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
***SEE COMMENTS***ePlan: [CORE & SHELL ONLY] WORK TO CORE & SHELL UNDER 19010-10000-05418 TO INSTALL 1-HR FIRE RATED DEMISING WALL TO DIVIDE INTO (2) TENANT SPACES "UNIT B1" (826 SF) AND "UNIT B2" (1,...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
(18) Window change-out (same size & type) for residential buildings. Dual glazing, labeled andcertified by National Fenestration Rating Council (NFRC), is required for doors and windows replacedin all...
Kitchen/(5) bathroom remodel for residential buildings (no structural changes) MECHANICAL, ELECTRICAL, PLUMBING INCLUDED(4) Door change-out (same size & type) for residential buildings. Dual glazing,...
Replace existing pre-fabricated fireplace with the same size and in the same location. Installation shall be as per manufacturers recommendations. An HVAC permit is required.
1 Kitchen 2 bathroom remodel for residential buildings (no structural changes). Inclusinf Mechanical, electrical and plumbing
13-Window and 2-door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council (NFRC), is required for doors and windows repla...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separateexpress electrical permit for new pool luminaire is required, when applicable, except for one a...
SUPPLEMENTAL TO Complete work done under previously expired permit #____21014-20000-05806______. Work is ___80___% complete(Minimum 75% percent completed as determined by inspection).MECHANICAL,ELECTR...
SUPPLEMENTAL TO Complete work done under previously expired permit #____20014-10000-03983_____. Work is ___90__% complete(Minimum 75% percent completed as determined by inspection).MECHANICAL, ELECTRI...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
"COMPLY WITH DEPARTMENT ORDER effective date04/26/2011. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". (5)Bathroom remodel for residential buildings (no structural changes). INCLUDING HVAC, ELECTRICA...
Kitchen/(2) bathroom remodel for residential buildings (no structural changes) MECHANICAL, ELECTRICAL, PLUMBING INCLUDED
Early start demo to existing retail. Removal of interior non load bearing partitions, ceilings, plumbing, electrical, and mechanical systems, but not including fire sprinklers or other fire safety sys...
Patch and repair ceilings on first floor and mezzanine level to modify smoke control system per mechanical permit (21044-10000-27915)
ePlan: Grading and site improvements for excavation and installation of concrete vaults housing mechanical equipment underground.