Other Permit — 919 THIRD AVENUE
Other
$19,800
Abco-Peerless Sprklr Corp
Gary Cappellani
New York County
Work Description
Modifications to the existing standpipe system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Other permits at this address
10 other permits at 919 THIRD AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Main roof replacement and traffic coating, as per plans. Work scope includes guardrail replacement and steel dunnage refurbishment. No change to use, egress, or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Modifications to the existing standpipe system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel