Roofing Permit — 919 THIRD AVENUE
Roofing
$2,210,070
Nations Roof East, Llc
Gary Cappellani
New York County
Work Description
Main roof replacement and traffic coating, as per plans. Work scope includes guardrail replacement and steel dunnage refurbishment. No change to use, egress, or occupancy.
Other permits at this address
10 other permits at 919 THIRD AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Modifications to the existing standpipe system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing standpipe system on the 47th Floor, as per plans. No change to use, egress, or occupancy.
More Roofing permits in Manhattan
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK PLATFORM AND NEW GRATING ON UPPER LEVEL OF TANK PL...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...