Building Permits in ZIP 94132
San Francisco, CA — 166 permits filed recently
166 permits
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
replacement of existing exterior windows and doors along south wall at garden court room. new door added between garden court room and event patio.
to obtain final inspection for work approved under pa# 425298. all work is complete.
re-roofing hot works
comply with nov# 202652131: new concrete in front set back and new paver.
reroofing with hot works, tear off, install 1,125sqft modified bitumen.
reroofing with hot works, tear off, install 800sqft modified bitumen, 700 sqft tile lift.
as built 202510318621- riser location moved, garage spacing changed from 100sf to 79sf, ups and downs moved, beams removed from main bedroom, pipe and head layout changed throughout the project
remodel (e) kitchen, breakfast nook, and sunroom. remove partition between (e) breakfast nook and kitchen. replace (e) skylight in breakfast nook
lower floor: remodel(e) bathroom, expand bathroom footprint to accomodate shower. upper floor: remodel (e) bathroom, remove non-structural partition wall between(e) bath & (e) water closet to make (1)...
to obtain final inspection for work approved under pa#202409060276 all work complete (fire only)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
on 2nd floor: kitchen and bathroom remodel, in kind, like to like, interior work only
suite #152: this is a temp store for crocs shoes. we will be painting, cleaning and installing sales fixtures. we have no mep work and will be utilizing existing.
replace 40 lineal feet of existing failing retaining wall with new soldier pile and lagging retaining wall
remodel bathroom, office and add bar sink at existing 1 story accessory building per plan
construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work.
erect 12'x24' storage shed on sf golf course.