Building Permits in ZIP 60632
Chicago, IL — 68 permits filed recently
68 permits
Permit expires on 06/13/2026 erection starts: 5/7/2026, erection ends: 10/3/2026. self cert. cbc 2019. reinstatement of 2025 permit 101066844 for the same 2 tents for the 2026 summer events from may 8...
Tuckpointing and unit masonry repair / replacement: 795 sq. ft., lintel qty. 0, max. length 0. location: masonry repairs -brick repair and tuckpointing.
Install solar panels on roof of accessory building. roof type: sloped (2:12 to 5:12). inverter output: 11.5 kw. array output: 10.8 kw. includes 13.5 kwh energy storage system. location: electric room,...
Install solar panels on roof of principal building. roof type: low-sloped (<2:12). inverter output: 11.5 kw. array output: 10.8 kw. includes 13.5 kwh energy storage system. location: electrical room,...
For permit b200457866: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Line voltage electrical work. new permanent 200 amp service disconnecting means with 1 circuits. receptacle outlets: 1 . lighting outlets: 0. specific location: all floors.
Repair or in-kind replacement of 4 plumbing fixtures as described in permit application. includes repair or replacment of plumbing piping. includes repair or replacement of plumbing risers in existing...
For permit 101067826: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
8 proposed evse charging stations at an existing non-accessory parking lot, per plans.
Tuckpointing and unit masonry repair / replacement: 1000 sq. ft., lintel qty. 0, max. length 0. location: tuckpointing.
For permit 101070245: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Scope: nonstructural interior removal of unpermitted residential unit features at attic returning to storage for sfr, cap and remove kitchen and bathroom plumbing at it's source, cap and remove gas li...
Install solar panels on roof of principal building. roof type: sloped (2:12 to 5:12). inverter output: 11.5 kw. array output: 5.4 kw. includes 13.5 kwh energy storage system. location: rooftop and ext...
New detached wood frame garage. dimensions and setbacks per application. building outside dimensions: 20'-0' ' x24'-0' '. gable roof height to peak: 14'-0' '.
Remove and replace the back porch floor attic and first floor and stairs form basement to first floor and first floor to attic, provide a drop attic stair and correct building violation property as pe...
Purpose: legalize unpermitted work. wood fence - 6'-0' ' (height) x 25'-0' ' (length). location: rear fence.
Electrical maintenance permit. occupancy: factory/industrial. start date: 4/1/2026. end date: 5/1/2026. all work under this permit must be performed by employees of the listed electrical contractor. t...
Scope: nonstructural interior alteration of basement unit, to remove nonload bearing partitions for open floor plan and cabinets from hallway. locations: 1 residential unit(s), 0 non-residential unit(...
For permit 100944382: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Line voltage electrical work. add 1 circuits to existing 200 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 0. electric vehicle supply equipment:1 spaces. specific location...