Building Permits in ZIP 19115
Philadelphia, PA — 100 permits filed recently
100 permits
Certificate of Occupancy (CO) (may include LO) - FOR CERTIFICATE OF OCCUPANCY FOR CHILD CARE- GROUP CHILD CARE AT 1ST FLOOR AS PER ZP-2025-011361. ****************NO WORK APPROVED ON THIS PERMIT. ****...
Addition and/or Alteration - Install 4 receptacles, 4 switches, 1 ceiling fan. Install 10 recessed lights. All work to be performed according to 2017 NEC.
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
Rough-In - Rough-In Permit for EP-2026-003059 Install fire alarm system in the Unit B.
Addition and/or Alteration - FOR THE REMOVAL AND REPLACEMENT IN KIND OF THE REAR ONE-STORY PORTION OF AN EXISTING DETACHED SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN. *NO CHANGE IN HEIGHT OR BUILDIN...
Signs (Accessory / Non-Accessory) - FOR ERECTION OF ONE (1) ILLUMINATED ACCESSORY FLAT WALL SIGN ON EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLAN.
Alterations - REPAIR/REPLACE SANITARY AND STORM CT, FAI & MD.
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...
New Construction or Additions - Install 2 full bathroom and 1 laundry.
Alterations - REPAIR/REPLACE CT, FAI & 3/4" WDP.
Addition and/or Alteration - INTERIOR ALTERATION TO THE DAY CARE CENTER ON THE GROUND FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN EN...
Alterations - Lateral seal for a demo
Alterations - REPAIR/REPLACE CT & FAI.
New Construction - NEW CONSTRUCTION OF A DETACHED THREE (3) STORY BUILDING (BUILDING 3) FOR USE TWELVE (12) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **...
New Construction - NEW CONSTRUCTION OF A DETACHED THREE (3) STORY BUILDING (BUILDING 1) FOR USE TWENTY-FOUR (24) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIE...
New Construction - NEW CONSTRUCTION OF A DETACHED THREE (3) STORY BUILDING (BUILDING 2) FOR USE EIGHTEEN (18) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW*...
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
Addition and/or Alterations - - For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission...
Alterations - REPAIR/REPLACE 3/4" WDP.