Building Permits in ZIP 11230
Brooklyn, NY — 263 permits filed recently
263 permits
Proposed accessory structure filed in conjunction with main building alt-co b00983530-i1
Temp. construction fence
Interior renovation to cellar, first, second, and attic floor of existing 2 1/2 story, Three (3) dwelling unit building, with horizontal enlargement and converting to a one (1) dwelling unit building....
Proposed accessory structure filed in conjunction with main building alt-co b00983530-i1
Interior renovation to cellar, first, second, and attic floor of existing 2 1/2 story, Three (3) dwelling unit building, with horizontal enlargement and converting to a one (1) dwelling unit building....
Temp. construction fence
Proposed installation of temporary fence as per plans. no change in use occupancy or egress under this application.
Filing for fence in conjunction to alt1 application.
Proposed installation of temporary fence as per plans. no change in use occupancy or egress under this application.
Filing for fence in conjunction to alt1 application.
Addition at all floors. Interior renovation
Addition at all floors. Interior renovation
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
Addition at all floors. Interior renovation
Installation of solar panels on existing roof structure. no change in egress,use, or occupancy.
REMOVE AND REPLACE 14 EXISTING ROOF DRAINS, Relocated three (3) vent stacks. and remove two (2) abandon gas vent piping from the exterior wall.
Proposed interior renovation of existing kitchen and bathrooms on the first and second floors as per plans. no change in use, egress or lot coverage.
Facade repair as per plans. brick replacement, lintel replacement, window sill replacement. filed for facade work permit only. no change in use, egress, or occupancy.
Facade repair as per plans. brick replacement, lintel replacement, window sill replacement. filed for facade work permit only. no change in use, egress, or occupancy.
Proposed interior renovation of existing kitchen and bathrooms on the first and second floors as per plans. no change in use, egress or lot coverage.