Building Permits in ZIP 11204
Brooklyn, NY — 338 permits filed recently
338 permits
Mechanical work associated with application#b01359339
Erect (4) aluminum storefront cabinets; replacing existing cabinets
To file PL plumbing work type in conjunction with DOB Now Build application job# B01224817. No change in use, egress or occupancy under this application.
Combining lots and buildings 5910, 5912 and 5916 20 Avenue. Hub consultation conducted.
File to install new AC units conjunction GC B01365701-P1, no change in use, egress or occupancy.
To file PL plumbing work type in conjunction with DOB Now Build application job# B01224817. No change in use, egress or occupancy under this application.
File to install new AC units conjunction GC B01365701-P1, no change in use, egress or occupancy.
Combining lots and buildings 5910, 5912 and 5916 20 Avenue. Hub consultation conducted.
Mechanical work associated with application#b01359339
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
File to plumbing work as per plan , conjunction GC application B01365701-P1, no change in use, egress or occupancy.
Plumbing work in conjunction with NB application # B00905775
File to plumbing work as per plan , conjunction GC application B01365701-P1, no change in use, egress or occupancy.
Plumbing work in conjunction with NB application # B00905775
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace stair at rear yard. no change in use, egress or occupancy under t...
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; replace stair at rear yard. no change in use, egress or occupancy under t...
partial plumbing work for istallation of new building sewer as per DEP site connection approval, DOB inspection for sewer line steel sleeve through foundation wall.
Installation of plumbing work as per the plans filed herewith. no change in use, occupancy or egress.
partial plumbing work for istallation of new building sewer as per DEP site connection approval, DOB inspection for sewer line steel sleeve through foundation wall.