Other Permit — 9 WEST 57 STREET
Other
$484,024
Structure Tone, Llc
Anthony Morin
New York County
Work Description
General construction taking place on sub-cellar #1 (b-2 marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Other permits at this address
10 other permits at 9 WEST 57 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Sprinkler modifications taking place on 48th floor construction (49th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, egress or occupancy.
Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, egress or occupancy.
Sprinkler modifications taking place at cellar as per plans filed herewith. no change in use, egress, or occupancy.
More Other permits in Manhattan
Facade work for hoist openings as shown on the plans.
Change of use of dwelling unit to community facility use. general construction work to include reconfiguration of partitions and doors.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Replacement of chiller and dedicated outside air unit.
Installation of temporary indoor structures consisting of a scenic arbor, a decorative trellis, and a performance platform.