Installation of temporary construction fence, supported scaffold, and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Other permits at this address
9 other permits at 859 7 AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Installation of temporary construction fence, supported scaffold, and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o...
full demolition of 26 story structure using hand held and mechanical means to assist.
full demolition of 26 story structure using hand held and mechanical means to assist.
EES will be built around all exposures adjoining the neighbors/sidewalks. It will be installed at the top 3 floors and work its way down floor by floor to the 2nd FL in progression with demolition.
EES will be built around all exposures adjoining the neighbors/sidewalks. It will be installed at the top 3 floors and work its way down floor by floor to the 2nd FL in progression with demolition.
mechanical equipment to assist with demolition and chute will be built to lower debris
mechanical equipment to assist with demolition and chute will be built to lower debris
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy.
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.