Plumbing Permit — 831 PRESIDENT STREET
Plumbing
$544,250
Coppermine Construction *
Igor Novgorodtsev
Kings County
Work Description
Convert existing 4 family Class A multiple dwelling to a 2 family dwelling, ALTERATION TO INCLUDE REMOVAL AND REPLACEMENT OF INTERIOR WALLS, PLUMBING FIXTURES AND APPLIANCES. SUB DOCS TO BE FILED FOR PL, MS, ST, SP WORK TYPES
Other permits at this address
8 other permits at 831 PRESIDENT STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Herewith file plans for plumbing work on floors cellar, basement, 1,2,3 of proposed two family dwelling (filed in conjunction with GC application)
Herewith file plans for plumbing work on floors cellar, basement, 1,2,3 of proposed two family dwelling (filed in conjunction with GC application)
Installation of temporary construction fence
Installation of temporary construction fence
Floor framing reinforcement/replacement & bearing wall reconstruction for removal/relocation of existing internal bearing walls, steel frame design for enlargement of opening at existing rear masonry...
Convert existing 4 family Class A multiple dwelling to a 2 family dwelling, ALTERATION TO INCLUDE REMOVAL AND REPLACEMENT OF INTERIOR WALLS, PLUMBING FIXTURES AND APPLIANCES. SUB DOCS TO BE FILED FOR...
Floor framing reinforcement/replacement & bearing wall reconstruction for removal/relocation of existing internal bearing walls, steel frame design for enlargement of opening at existing rear masonry...
Convert existing 4 family Class A multiple dwelling to a 2 family dwelling, ALTERATION TO INCLUDE REMOVAL AND REPLACEMENT OF INTERIOR WALLS, PLUMBING FIXTURES AND APPLIANCES. SUB DOCS TO BE FILED FOR...
More Plumbing permits in Brooklyn
Propose plumbing work only to replace one (1) pvc pipe with cast iron pipe in cellar of existing 3-story building. no work for existing mechanical room, existing gas meters, or electric meters.
Plumbing work filed in conjuction with alt-co as per plans filed herewith.
P.S. 44-K: Modification of Building Plumbing in association to Accessibility project at school and in conjunction with architectural scope of work including new Elevator.
Removal of plumbing work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Subsequent application filed for plumbing modifications/additions in the cellar and on the 1st floor (stretch lab) as per plans filed herewith. no change in use, egress, or occupancy