Plumbing Permit — 800 THIRD AVENUE
Plumbing
$12,000
A&A Plumbing Corp
Gary Cappellani
New York County
Work Description
Plumbing Fixture changes as indicated on plans.
Other permits at this address
10 other permits at 800 THIRD AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Corridor and bathroom modifications
Corridor and bathroom modifications
Modifications to existing sprinkler system on 12th floor (north) per plans. No change to use, egress or occupancy.
Modifications to existing sprinkler system on 12th floor (north) per plans. No change to use, egress or occupancy.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Interior demo of non load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Demolition and general construction work on 12th floor partial as per plans. No change to use, egress or occupancy.
Modifications to mechanical system on 12th floor partial as per plans. No change in use, egress or occupancy.
More Plumbing permits in Manhattan
plumbing modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy
Filed to propose wet bar and replacement of bathroom plumbing fixtures at first floor apartment.
Filing for new plumbing and sprinkler work associated w/tenant fit out, as per plans submitted herewith. No change to use, egress or occupancy.
New Installation of one (1) floor drain , one (1) trench drain, two (2) shower heads, one (1) submersible sump pump to be connected to existing system. No change in use or egress.
Plumbing modifications to the 19C/20M floor as per plans filed herewith. No change is use, egress or occupancy.