Solar Permit — 6 HILLSIDE CT
Solar
Not listed
Contact info hidden
Travis County
Work Description
Request to disconnect - Install polaris blocks for solar interconnection
More Solar permits in Austin
Install new 5.67 KWDC solar system servicing new residential only. Bluebonnet
Electrical temporary disconnect required for solar energy system install. No changes to structure proposed.
Installation new 4.4kw solar DC system with new 11.92kwh energy storage system . Installation new 125A Service sub panel
Installation of 60.72 kW solar panel system on existing metal structure. I was instructed by commercial permit review to file for an AUX permit for this project as it is located in the Austin 2 mile E...
Electrical temporary disconnect required for solar energy system install. No changes to structure proposed. EP Added and AUX removed as this is BlueBonnet electrical service