Renovation Permit — 599 LEXINGTON AVENUE
Renovation
$301,441
Jt Magen & Company Inc
Patrick Cooper
New York County
Work Description
Interior renovation as per plans filed herewith.
Other permits at this address
10 other permits at 599 LEXINGTON AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/addition to sprinkler system and related piping and installation of temporary core sprinkler protection as shown on drawings. No change in use, egress or occupancy.
Modification/addition to sprinkler system and related piping and installation of temporary core sprinkler protection as shown on drawings. No change in use, egress or occupancy.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Removal of interior partitions, doors and ceilings of existing suite as shown on drawings. No change in use, egress or occupancy.
More Renovation permits in Manhattan
Interior renovation & combination of existing apartments 6a & 6b on the 6th floor, as per with tppn 3/97. work to include partition changes and lighting. no change in use egress or occupancy.
Interior renovation of apt. 10b on the 10th floor. no change to use, egress, or occupancy.
Structural work filed to install new steel lintels, masonry infill and slab repair.
Proposed renovation of primary bathroom at first floor of exist. two story plus cellar condominium unit# 5 as indicated on plans. no changes to exist. use, occupancy, or egress.
Facade repairs as per plans filed. no change in use or egress under this application.