Demolition Permit — 55 HUDSON YARDS
Demolition
$20,000
Tri-Star Construction Cor
Christopher Trimboli
New York County
Work Description
Herewith filing for interior soft demolition on the 49th (marketing flr 50) and 50th (marketing flr 51) per plans. no change in use, occupancy or egress under this application.
Other permits at this address
10 other permits at 55 HUDSON YARDS. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
The new ductwork and piping work on the 29th floor
The new ductwork and piping work on the 29th floor
Interior Tenant Build-Out
Interior Tenant Build-Out
Herewith filing for interior soft demolition on the 49th (marketing flr 50) and 50th (marketing flr 51) per plans. no change in use, occupancy or egress under this application.
Removal of fixtures
Removal of fixtures
Modifications of existing sprinkler system
Interior Demo at Level 29
Remove all existing air handlers, ceiling and floor mounted airconditioning units with all associated ductwork, terminal boxes,diffusers, grilles, hangers and accessories.c. remove all exhaust,remove...
More Demolition permits in Manhattan
Herewith filing for structural demolition work as per plans. no change to use egress or occupancy under this application.
Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy.
Demolition of non-structural facade finishes and substructure. Removal of existing backlit signage. Installation of new facade finishes. No change of use group, occupancy, zoning or egress.
Structural and construction work to replace existing first floor and eighth floor rtu's with split systems. New cassettes to be installed at first and eighth floors. See mechanical drawings. Demolitio...
Interior renovation of 3rd floor commercial space. Work to include minor non structural demolition. no change in use, egress and occupancy