Demolition Permit — 4819 BUTLER ST, PA 15201
Demolition
$60,000
Allegheny County
Work Description
Interior & exterior alterations to two-story masonry building for coffee shop fitout with exterior seating area at rear. work includes selective demolition, structural work, new interior walls, ceilings, doors & hardware, casework and finishes. exterior work includes new windows, doors & hardware.
More Demolition permits in Pittsburgh
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
City Funded Demolition 5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures. 6. Fence off entire length of parcel to pedestrian traffic using 6...
City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot. 2. Contract term 60 days from award date. 3. ACHD asbestos applic...
Demo existing 2 story detached house
This project includes the conversion of an existing tenant space into a non-alcoholic bar with retail. work to include minor demolition on the second level (no demo to occur on mezzanine level), new a...