Demolition
Not listed
Martin Frazier
Frazier R.
Philadelphia County
Make Safe Permit For RP - MAKE SAFE PERMIT TO COMPLY WITH CF-2024-096905 TO INCLUDE PARTIAL DEMOLITION OF FRONT PORCH SLAB AND CHIMNEY AND INSTALL NEW SLAB FRONT PORCH, REPOINT REAR WALL WHERE NEEDED AND REPLACEMENT OF REAR DECK HANDRAILING AS PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT ADDRESSED IN APPROVED PLANS.
Minor Demolition - FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY HAND ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO THE START...
Full Demolition - For the complete demolition (>2/3rds of existing joists and at least one (1) exterior wall to be removed) of an existing attached structure, size and location as shown on plan/applic...