Other Permit — 445 PARK AVENUE
Other
$144,000
A.W. & S. Construction Co
Jay Futersak
New York County
Work Description
Application filed for mechanical additions/modifications on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Other permits at this address
6 other permits at 445 PARK AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Application filed for plumbing/sprinkler modifications/additions on the 6th floor (altfest) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for structural additions/modifications (slab infill) on the 17th fl (gabriel capital) & partial 18th fl as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for mechanical additions/modifications on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for structural additions/modifications (slab infill) on the 17th fl (gabriel capital) & partial 18th fl as per plans filed herewith. no change in use, egress, or occupancy.
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel