Plumbing Permit — 3907 GREYSTONE DR
Plumbing
Not listed
Travis County
Work Description
Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. Will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. Sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet.
More Plumbing permits in Austin
*Partial Demo* Interior remodel of condo SFR
install gas pipe for generator
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [3bed 2bath] Work to include: First floor addition new bed new bath [4bed 3bath] and modify driveway t...
New construction of a 2-Story Single Family Res. [4 bed 3.5 bath] with Attached carport
Replacing kitchen sink waste water going around east side 85 feet and tying into main replacing cast iron under front side of house tunneling approximately 8 feet under foundation to vanity 6 feet to...